Kiss between ABC fans in Access game generates homophobic attacks on the web

Photo: Reproduction

The Federal Ministry of Public Affairs (MPF) referred to as for the intervention of a part of the construction of Pusada Marjora, in the space of ​​the cliffs of Pipa Beach in Tibou do Sul (RN). A technical report contracted by City Hall signifies that the challenge is positioned in an space of ​​instability, with a critical danger of landslides. In a public civil motion, the MPF had already questioned irregularities in the building of the inn since 2015.

The MPF says that in line with the technical report, “the scenario may be very critical and really worrying. Considering the gravity and gravity of the matter, one shouldn’t watch for the tragedy to occur to take motion. Blockage of a part of the enterprise is the greatest safety measure for a catastrophic accident”, he defended.

In the examine, engineers recognized cracks in the wall of 1 room and in the wall offering entry to the stairwell, which was already closed. He additionally verified that deck It is located on the very fringe of a cliff above sewage pipes with unknown origin and vacation spot. In addition, the pool poses a danger as a result of it’s positioned near the fringe of the cliff, with the flooring sinking and visual put on and tear on the stone wall that helps the construction with cracks and moisture.

Thus, the subject of technical suggestion is to distinguish deck, Its reconstruction and relocation of the fence to an space inside security limits needs to be evaluated. Engineers additionally suggest interdicting a constructing on the fringe of a cliff (condo) due to the danger of landslides in the brief time period.

The MPF emphasizes that “in addition to the environmental danger, there’s an imminent danger to the security and lifetime of the inn’s folks, company and employees, in addition to bathers who could also be in the seashore space under the inn, Because the act of wave pulsation at the foot of the reef, in addition to marine human intervention, can hasten the collapse of the reef construction.

Public civil motion 1. being processed in Under Federal Court No. 0804207-28.2015.4.05.8400 in Rio Grande do Norte.

technical Report – Following the tragedy that killed a household of vacationers when a rock collapsed at Pipa in 2020, the MPF stepped up its efforts to regularize building in the at-risk space. As a end result, the municipality of Tibou do Sul was instructed to contract technical research on the standing of 28 enterprises, together with Pusada Marjora.

With the report’s conclusion, the Municipal Civil Defense issued a notification of preventive interventions, however was barred from finishing up the interventions recommended by the defendants in the examine, as reported by the company in the Bulletin of Occurrence.

irregular building – The MPF has been demanding regularization of pusada marjora since 2015, when it filed a public civil motion in opposition to the enterprise and its entrepreneurs for constructing with out authorization or environmental license, partly in territory belonging to the federal authorities. In addition, the enterprise occupied greater than a thousand sq. metersTwo The everlasting conservation space, with the building of a bar and ladder minimize into the physique of the rock, was later expanded to incorporate a tubular nicely, kids’s pool and viewpoint.

Leave a Comment